A 27,798 square foot 108-bed facility includes general population housing units, a segregation housing unit, a dormitory, a full kitchen, intake and release areas, a 911 communications area and Sheriff’s Office. This project was designed to allow for expansion as the County’s needs grow. The facility is block and brick construction with bar joist, metal decking, and built up and standing seam roofing system. The project included all associated support areas and a 6,000 square foot law enforcement center. Group III Mgt., Inc. worked closely with the Designer of Record to ensure that the fast-track completion deadline of 15 months was met.
Construction consisted of poured-in-place concrete slabs on grade and elevated slabs for office space and detention cells. There was an extensive waste treatment system installed with two 10,000 gallon holding tanks.